Description: Product Description WATER PIPE WELDING TIME REFERENCE 1, ACCURATELY MASTER THE HEATING TIMEWATER PIPE WELDING TIME REFERENCE If the heating time ls too short, It is easy to cause uneven heating of the plpe fittings. This leads to diffmculties In matching. the heating time ls too long. The plpe fittings are easy to melt and cause too much colloldal substance to be lost. The heating time selection can refer to the following table. PIPE DIAMETER /mm MELTING TIME/s PIPE DIAMETER/mm MELTING TIME/s 20 5 63 24 25 7 75 30 32 8 90 40 40 12 110 50 50 18 2,THERE SHOULD BE NO ROTATION WHEN DOCKING Key points for hot-melt connection of plpes and fittings: After the heating time ls reached,Immedlately remove the plpes and fittings from the heating Jacket and heating head at the same time,and Insert them to the marked depth In a stralght line wlthout rotation,and a unlform flange ls formed at the Joint
Price: 142.3 USD
Location: shenzhen
End Time: 2025-02-01T17:01:31.000Z
Shipping Cost: 128.2 USD
Product Images
Item Specifics
Restocking Fee: No
Return shipping will be paid by: Buyer
All returns accepted: Returns Accepted
Item must be returned within: 30 Days
Refund will be given as: Money Back
Iron box size: 44*27*10cm
Local Service Location: None
After Warranty Service: Online support
Showroom Location: None
MPN: Does not apply
Frequency: 50Hz
Power: 750W+750W
Welding Area: 20-110MM
Weight (KG): 7kg
Applicable scope: PPR/PE/PB/ PVC
Origin: Mainland China
DIY Supplies: ELECTRICAL
Marketing Type: New Product 2020
Warranty: 1 Year,1year
After-sales Service Provided: Free spare parts,Online support
Dimensions: 44*27*10CM
Power (kW): 1500W
Product Name: Ppr water pipe
Enviorment temperature: 0°C-4°C
Brand: Unbranded
Usage: Hydropower Engineering
Applicable Industries: Hotels,Garment Shops,Building Material Shops,Machinery Repair Sho
Type: Paper shredder
Adjustable temperature: 0-300
Voltage: 220V,220V
Machinery Test Report: Provided
Model: RRQ-WM-M1
Video outgoing-inspection: Provided
Place of Origin: Zhejiang,China