Revere

VINTAGE SCRIPTO Extra Strong Drawing Writing Long Leads (22) U.S.A. No 188 Red

Description: Five full boxes with 4 leads each, one partial box with 2 leads, total of 22 leads

Price: 14.95 USD

Location: Jarrell, Texas

End Time: 2024-12-31T00:56:47.000Z

Shipping Cost: N/A USD

Product Images

VINTAGE SCRIPTO Extra Strong Drawing Writing Long Leads (22) U.S.A. No 188 RedVINTAGE SCRIPTO Extra Strong Drawing Writing Long Leads (22) U.S.A. No 188 Red

Item Specifics

All returns accepted: ReturnsNotAccepted

Brand: scripto

Type: extra strong drawing leads refill

Lead Diameter: Unspecified

Material: Paper & Wood

Country/Region of Manufacture: United States

Modified Item: No

Vintage: Yes

Recommended

Mechanical Pencil 8 Scripto W Advertisements Vtg Oil Tools Auto  Working
Mechanical Pencil 8 Scripto W Advertisements Vtg Oil Tools Auto Working

$15.40

View Details
junk drawer lot keychains scripto cigarette lighter etc
junk drawer lot keychains scripto cigarette lighter etc

$36.50

View Details
Vintage SCRIPTO No 4 Yellow Mechanical Pencil W/ Pocket Clip
Vintage SCRIPTO No 4 Yellow Mechanical Pencil W/ Pocket Clip

$12.99

View Details
Vintage RARE 3x Scripto Double-End Ballpoint Pen  Slide T420
Vintage RARE 3x Scripto Double-End Ballpoint Pen Slide T420

$40.00

View Details
Lot of  Vintage Scripto 4" Long Lead .046" Mechanical Pencil Eversharp
Lot of Vintage Scripto 4" Long Lead .046" Mechanical Pencil Eversharp

$14.99

View Details
Vintage Scripto USA Fluid Vu-Lighter Jumping Fish Trout Red Band Pat 1959 GUC
Vintage Scripto USA Fluid Vu-Lighter Jumping Fish Trout Red Band Pat 1959 GUC

$12.50

View Details
Vintage Scripto Pen And Mechanical Pencil w/ Box Gold & Black
Vintage Scripto Pen And Mechanical Pencil w/ Box Gold & Black

$20.00

View Details
Vtg Scripto Fly Fishing Lure - Scripto VU Bird Hunting Man Dog 2pc Lighter Set
Vtg Scripto Fly Fishing Lure - Scripto VU Bird Hunting Man Dog 2pc Lighter Set

$50.00

View Details
Scripto Aim'nFlame II Torch Flame Utility Lighter
Scripto Aim'nFlame II Torch Flame Utility Lighter

$67.10

View Details
Vintage Scripto Property US Government Black Mechanical Pencil
Vintage Scripto Property US Government Black Mechanical Pencil

$15.99

View Details